Abstract

Electricity is able to make a positive change and contribution to people's lives and well-being. This study aims to assess the feasibility of investment in the construction of low voltage electricity networks. The method used with project evaluation analysis is based on financial analysis. The criteria used to analyze activities carried out for 10 years use payback period (PP) analysis, net present value (NPV), internal rate of return (IRR), and profitability index (IP). The results showed that the analysis of investment planning can be carried out with the consequence of the results obtained in the form of not so large returns. PP results show the investment value with the payback period method will Return in the 9th year, while the positive NPV value is still above zero while the IRR value shows the value of 11% below the social discount rate as well as the IP value showing the value of 0.90. The feasibility of investment in terms of economic-financial analysis by looking at per criteria shows that investment is still feasible to be carried out with minimal profit levels.

Author Biography

Henny Dwijayani, Universitas Darul Ulum

Program Studi Manajemen, Universitas Darul Ulum Jombang

References

T. K. K. ESDM, “Menuju Rasio Elektrifikasi 99 Persen pada 2019,” http://ebtke.esdm.go.id, 2018.

D. Ajiatmo and P. H. Sasongko, “Estimasi biaya minimal pembangunan jaringan tegangan menengah sistem tenaga listrik,” Gadjah Mada, 2004.

H. Dwijayani, “Analisis Rasio Likuiditas Dan Solvabilitas Kinerja Keuangan PT PLN (Persero),” Econ. Bisnis Account., vol. 2, no. 7, pp. 169–180, 2015.

H. Dwijayani, Surachman, Sumiati, and H. Djuwahir, “The Influence of The Investment Policy and Information Asymmetry,” Int. J. Econ. Perspect., vol. 11, no. 3, pp. 2036–2042, 2017.

Kadariah, L. Karlina, and C. Gray, Pengantar Evaluasi Proyek. Jakarta: Lembaga Penerbit Fekon UI, 1999.

Jumingan, Studi Kelayakan Bisnis, 1st ed. Jakarta: Bumi Aksara, 2009.

F. Weston J, T. E. Copeland, J. Wasana, and Kirbrandoko, Manajemen Keuangan, Jilid 2. Jakarta: Binarupa Aksara, 1992.

K. Subramanyam and J. J. Wild, Analisis Laporan Keuangan, 10th ed. Jakarta: Salemba Empat, 2010.

Kasmir, Analisis Laporan Keuangan, 2nd ed. Jakarta: Rajawali, 2009.

H. Sufitrihansyah, M. Ali R., D. Ajiatmo, and M. Ali, “Penggunaan Binary Particle Swarm Optimization untuk Rekonfigurasi Jaringan Tenaga Listrik pada Penyulang Meri,” Prosiding-1 Semin. Nas. Foertei7 -1 2018, vol. 1, no. 1, pp. 134–138, 2018.

D. Ajiatmo and A. H. . Wigantoro, “Kajian Mencari Alteratif Keandalan Sistem Kelistrikan dan Efisiensi Jaringan Saluran Udara Tegangan Menengah (Studi Kasus: PT PLN (Persero) Area Situbondo),” J. Intake, vol. 4, no. 1, pp. 50–62, 2013.

Rukslin, Muhlasin, A. Raikhani, and D. Ajiatmo, “Analisa Perencanaan Trafo Sisipan T. 166 Pada Jaringan Distribusi T. 92 di Ds. Selorejo Kecamatan Mojoagung Kabupaten Jombang,” J. Intake, vol. 5, no. 2, pp. 53–67, 2014.

A. Rodgers, “System Planning Guide, Construction Work Plans,” United States Department of Agriculture Rural Utilities Service, 1993.

PT. PLN (Persero), Spesifikasi Desain untuk Jaringan Tegangan Menengah (JTM) dan Jaringan Tegangan Rendah (JTR). Jakarta: Departemen Pekerjaan Umum dan Tenaga Listrik, 1987.

M. Pudjosumarto, Evaluasi Proyek, 2nd ed. Yogyakarta: Liberty, 1991.

Published

2020-10-24

How to Cite

[1]
Dwi Ajiatmo and Henny Dwijayani, “Analisis Perencanaan Investasi Jaringan Tenaga Listrik ”, jeetech, vol. 1, no. 2, pp. 51-56, Oct. 2020.