Analisa Keandalan Sistem Jaringan Distribusi 20 KV Dan Rekonfigurasi Recloser Pada Penyulang Kamal
Keywords:
Fuzzy Logic, Reliability Index Assessment, SAIFI, SAIDIAbstract
The increasing population in the Kamal area has improved the demand for electrical energy needs. Consequently, disruptions to the electricity distribution network may happen, such as blackouts in certain areas. The value of the reliability index will increase and not be in accordance with the standards that have been set. For this reason, this study calculated the reliability values of SAIFI and SAIDI on the Kamal feeder using the RIA (Reliability Index Assessment) method and the recloser reconfiguration using the fuzzy logic method. The simulation results indicated that the SAIFI value gained 6.331 times/year, while SAIDI obtained 20.212 hours/year. Based on recloser reconfiguration, the SAIFI value was earned 4.926 times/year, whereas SAIDI got 15.962 hours/year. The best location was located on line nineteen in group three, producing an output value of 0.461.
References
S. Hani, G. Santoso, and R. D. Wibowo, “PENEMPATAN RECLOSER SEBAGAI PARAMETER KEANDALAN SISTEM PROTEKSI PADA SISTEM DISTRIBUSI,” pp. 21–27, 2019.
A. Iswahyudi, N. E. Setiawati, and dan Tjahja Odinanto, “Analisa Keandalan dan Penempatan Recloser pada Distribusi 20 KV Penyulang Gading PT.PLN (Persero) UPJ Mojokerjo,” no. 1, pp. 19–24, 2021.
A. Ilmiah, T. Elektro, J. E. Wicaksono, and D. Suhardi, “Analisis Keandalan Sistem Distribusi Penyulang Lowokwaru Menggunakan Metode Ria ( Reliability Index Assessment ),” vol. 1, no. 2, pp. 108–115, 2019.
J. Luis da Costa, R. Sari Hartati, and W. Setiawan, “Optimasi Penempatan Recloser Untuk Memperbaiki Keandalan Pada Penyulang Lembongan Menggunakan Metode Particle Swarm Optimization-Fuzzy,” J. SPEKTRUM, vol. 5, no. 2, p. 129, 2018, doi: 10.24843/spektrum.2018.v05.i02.p16.
M.Sholikhur Rijal, “Analisa Keandalan Sistem Distribusi dengan Metode RIA Pada Sistem Distribusi 20 KV Di PT. PLN (Persero) APJ Jember,” 2020.
F. Funan and W. Sutama, “Evaluasi Keandalan Sistem Distribusi Tenaga Listrik Berdasarkan Indeks Keandalan SAIDI dan SAIFI pada PT PLN ( PERSERO ) Rayon Kefamenanu,” J. Ilm. Telsinas, vol. 3, no. 1, pp. 32–36, 2020.
D. Ariadi, P. Hasugian, P. T. Elektro, F. Teknik, U. Muhammadiyah, and S. Utara, “OPTIMASI PENEMPATAN RECLOSER TERHADAP KEANDALAN PADA SISTEM DISTRIBUSI DI PT. PLN (PERSERO) KOTA SUBULUSSALAM, ACEH,” 2020.
P. Studi Teknik Elektro Jurusan Teknik Elektro, “ANALISA KEANDALAN SISTEM DISTRIBUSI 20 KV PT. PLN (PERSERO) AREA PELAYANAN JARINGAN (APJ) PONTIANAK METODE RELIABILITY NETWORK EQUIVALENT APPROACH (RNEA) Fadli Atmajaya,” J. Tek. Elektro Univ. Tanjungpura, vol. 1, no. 1, pp. 1–9, 2019, [Online]. Available: https://jurnal.untan.ac.id/index.php/jteuntan/article/view/31828.
haerul pathoni usep zulkipli, “studi analisis keandalan sistem distribusi 20kV PT. PLN (PERSERO) UP3 jambi ULP Kotabaru,” Pap. Knowl. . Towar. a Media Hist. Doc., vol. 5, no. 2, pp. 40–51, 2021.
S. I. Maliky, Alen Tri. Haryudo, “ANALISIS KEANDALAN SISTEM DISTRIBUSI 20kV PADA PENYULANG PEJANGKUNGAN DI PT PLN PASURUAN MENGGUNAKAN METODE RIA ( RELIABILITY INDEX ASSESMENT ),” Keandalan Sist. Tenaga List. Jar. Distrib. 20kV Pada Penyulang Pejangkungan Dengan Metod. RIA, vol. 09, no. 01, pp. 835–843, 2020.
J. T. Elektro, F. Teknik, and U. Mataram, “Analisis Kontingensi Pada Sistem Tenaga Listrik Menggunakan Logika Fuzzy.”
Published
How to Cite
Issue
Section

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.