Abstract

The electric power distribution system is the final component that is connected to consumers in the energy transmission chain. This distribution system is particularly vulnerable lightning strikes that can cause conductor cables to break. The 20 kV distribution network of the Rambutan Feeder, under Bandar Jaya ULP in Lampung, experienced a lightning strike that resulted in the disconnection of the AAACS cable, leading to a power outage in the service area. The geographical conditions of the Lampung region, which has a high isokeraunic level, contribute significantly to the likelihood of lightning-related disturbances. Based on real data, this study analyzes the impact of disturbances caused by lightning strikes on Feeder and proposes mitigation strategies to minimize the effects of resulting power outages. Analysis using ETAP shows that the recomendation to divert the load sypply to the arimbi feeder is able to maintain the bus voltage at a rating of 19,86 KV.

References

A. J. Pansini, Guide To Electrical Power Distribution Systems, 6th Ed. Lilburn, Ga : Boca Raton, Fl: Fairmont Press ; Distributed By Marcel Dekker/Crc Press, 2005.

T. Gönen, Electric Power Distribution Engineering, 3rd Ed. Taylor & Francis, 2014.

J. H. Eto, K. H. Lacommare, H. C. Caswell, And D. Till, “Distribution System Versus Bulk Power System: Identifying The Source Of Electric Service Interruptions In The Us,” Iet Generation Trans &Amp; Dist, Vol. 13, No. 5, Pp. 717–723, Mar. 2019, Doi: 10.1049/Iet-Gtd.2018.6452.

M. S. S. Fogliatto Et Al., “Power Distribution System Interruption Duration Model Using Reliability Analysis Regression,” Electric Power Systems Research, Vol. 211, P. 108193, Oct. 2022, Doi: 10.1016/J.Epsr.2022.108193.

“Most Common Causes Of Power Outages,” Enerson Electrical. [Online]. Available: Https://Enersolelectrical.Com.Au/Blog/Common-Causes-Power-Outages

H. Sun, F. Li, C. Sticht, And S. Mukherjee, “Outage Cause Classification Of Power Distribution Systems With Machine Learning And Real-World Data,” In 2022 Ieee Power & Energy Society General Meeting (Pesgm), Denver, Co, Usa: Ieee, Jul. 2022, Pp. 1–5. Doi: 10.1109/Pesgm48719.2022.9916833.

P. W. Billinton R., “Impacts Of Station-Related Failures On Distribution System Reliability,” Electric Power Components And Systems, Vol. 29, No. 11, Pp. 965–976, Nov. 2001, Doi: 10.1080/153250001753239194.

C.L. Wadhawa, Electrical Power Systems. New Academic Science, 2012.

E. Csanyi, “The Most Common Failure Modes Of Electrical Equipment In Distribution Systems,” Electrical Engineering Portal, Oct. 25, 2024. [Online]. Available: Https://Electrical-Engineering-Portal.Com/Failure-Modes-Electrical-Equipment-Distribution-Systems

“An Insight Into The Mv Cable Distribution Network, Faults, Maintenance And Why You Should Look For Basec Product Approval,” Basec, Feb. 28, 2023. [Online]. Available: Https://Www.Basec.Org.Uk/News/2023/2/28/An-Insight-Into-The-Mv-Cable-Distribution-Network-Faults-Maintenance-And-Why-You-Should-Look-For-Basec-Product-Approval/

M. Suheri, Y. Yulisman, And M. Kamil, “Analisis Penurunan Gangguan Akibat Petir Pada Transmisi 150 Kv Penghantar Maninjau – Simpang Empat Menggunakan Dgs (Direct Grounding System),” Err, Vol. 1, No. 3, Pp. 183–188, Aug. 2022, Doi: 10.33559/Err.V1i3.1254.

O. B. Wardhana And R. Hidayat, “Implementation Of Medium Voltage Automatic Change Over (Aco-Mv) Device As Power Outage Reduction For Premium Customers At Pt Pln (Persero) Up3 Kramat Jati,” Teknokom, Vol. 6, No. 2, Pp. 96–103, Jul. 2022, Doi: 10.31943/Teknokom.V6i2.144.

S. Rahardja, A. Y. Handaya, And A. Barmawi, “Pengaruh Lama Paparan Trauma Listrik Terhadap Sistem Saraf Traktus Gastrointestinal Pada Tikus Wistar Galur Murni,” Intisari Sains Medis, Vol. 12, No. 2, Pp. 504–507, Jul. 2021, Doi: 10.15562/Ism.V12i2.1001.

Sukamdi, Sri Wahyuni Dali, Chandra Wiharya, And Abdu Alimil Asror, “Perencanaan Instalasi Penangkal Petir Pada Bangunan Industri Furniture,” Elposys, Vol. 9, No. 2, Pp. 52–57, Feb. 2023, Doi: 10.33795/Elposys.V9i2.616.

Syafriyuddin, M. Suyanto, S. Subandi, And M. E. Efendi, “Analisa Perencanaan Penangkal Petir Pada Gedung Kampus Bima Sakti Ist Akprind Yogyakarta,” Prosid Sem Nas Teknoka, Vol. 4, Pp. E1–E8, Dec. 2019, Doi: 10.22236/Teknoka.V4i0.3978.

“Lightning Density Maps Obtained By Keraunic Levels, Lightning Detection Network Data And Satellite Observations,” In 2011 International Symposium On Lightning Protection, Fortaleza: Ieee, Oct. 2011.

Pln Ulp Up3 Metro, “Monitoring Aktifitas Penyulang Ulp Up3 Metro,” Jul. 2025.

D. F. Iman, P. Khaerunnisa, H. M. Fitri, And D. Aribowo, “Analisis Operasional Sistem Distribusi Tegangan Menengah Ke Tegangan Rendah Di Gardu Induk Serang,” Jepca, Vol. 7, No. 2, P. 66, Dec. 2024, Doi: 10.33087/Jepca.V7i2.119.

P. M. Anderson, Analysis Of Faulted Power Systems. In Ieee Press Series On Power Engineering. New York Chichester Weinheim: Ieee, Wiley-Interscience, 1995. Doi: 10.1109/9780470544129.

E. Stracqualursi, R. Araneo, A. Andreotti, J. B. Faria, F. H. Silveira, And S. Visacro, “Effects Of Macromodeling On The Simulation Of Transient Events Caused By Direct Lightning To Overhead Power Lines,” Electric Power Systems Research, Vol. 235, P. 110866, Oct. 2024, Doi: 10.1016/J.Epsr.2024.110866.

A. R. J. Araujo And S. Kurokawa, “A Tutorial About Tower Transmission Models For The Analyses And Prediction Of Backflashovers,” Ieee Latin Am. Trans., Vol. 15, No. 8, Pp. 1432–1438, 2017, Doi: 10.1109/Tla.2017.7994789.

Z. Mohammed, H. Hizam, And C. Gomes, “Lightning-Induced Transient Effects In A Hybrid Pv–Wind System And Mitigation Strategies,” Electric Power Systems Research, Vol. 174, P. 105882, Sep. 2019, Doi: 10.1016/J.Epsr.2019.105882.

T. Horváth, Understanding Lightning And Lightning Protection: A Multimedia Teaching Guide, 1st Ed. Wiley, 2006. Doi: 10.1002/9780470030875.

D. S. Yansuri, S. Subianto, And M. A. Akbar, “Evaluasi Jenis Kabel Dari Tembaga Ke Alumunium Untuk Distribusi Power Supply 20 Kv Coal Conveyor,” Jte, Vol. 11, No. 2, Pp. 9–17, Dec. 2021, Doi: 10.36546/Jte.V11i2.488.

R. B. Kalombo, J. M. G. Martínez, J. L. A. Ferreira, C. R. M. Da Silva, And J. A. Araújo, “Comparative Fatigue Resistance Of Overhead Conductors Made Of Aluminium And Aluminium Alloy: Tests And Analysis,” Procedia Engineering, Vol. 133, Pp. 223–232, 2015, Doi: 10.1016/J.Proeng.2015.12.662.

R. B. Kalombo, G. Reinke, T. B. Miranda, J. L. A. Ferreira, C. R. M. Da Silva, And J. A. Araújo, “Experimental Study Of The Fatigue Performance Of Overhead Pure Aluminium Cables,” Procedia Structural Integrity, Vol. 19, Pp. 688–697, 2019, Doi: 10.1016/J.Prostr.2019.12.075.

R. D. Mohammedi, R. Zine, M. Mosbah, And S. Arif, “Optimum Network Reconfiguration Using Grey Wolf Optimizer,” Telkomnika, Vol. 16, No. 5, P. 2428, Oct. 2018, Doi: 10.12928/Telkomnika.V16i5.10271.

Z. Liu, R. Xiong, Z. Tian, X. Liang, And F. Yan, “Evaluation Of Maximum Power Supply Carrying Capacity Of Medium-Voltage Distribution Network Considering Feeder Segment Transfer,” Electr Eng, Vol. 107, No. 1, Pp. 433–444, Jan. 2025, Doi: 10.1007/S00202-024-02532-3.

C. J. Wu, H. S. Huang, And J. H. Too, “Using Phase Shifter And Oltc To Improve Reliability During Load Transferring And System Protection,” Amr, Vol. 732–733, Pp. 976–980, Aug. 2013, Doi: 10.4028/Www.Scientific.Net/Amr.732-733.976.

Published

2025-11-17

How to Cite

[1]
M. K. Anam, M. Wartana, and I. Budi Sulistiawati, “Analysis of Load Diversion Due to AAACS Cable Breaks in the Bandar Jaya Lampung Distribution System ”, jeetech, vol. 6, no. 2, pp. 110-119, Nov. 2025.