Analisis Perbandingan Biaya Pelaksanaan Pelat Beton Konvensional Dengan Pelat Autoclaved Aerated Concrete

Kata Kunci:

Conventional plates, Panel plates, cost efficiency, implementation methods

Abstrak

The construction industry is rapidly evolving along with technological advancements. This is accompanied by a growing selection of resources, materials, and work methods available for construction projects, all of which aim to improve the quality and quantity of work. This allows project managers to select a specific construction method from among several available alternatives. One effort undertaken by project managers is to replace conventional methods with new, more modern ones. One such effort is the innovation of the plate method using panels as an alternative to the conventional plate method. From the research results, it was found that the calculation of the conventional floor plate work RAB for a 2-story office in Kediri City was Rp. 222,061,956.76 (from MC-0%) and the actual work cost was Rp. 199,113,443.36 (from MC-100%) with a difference of Rp. 22,948,513.40. The RAB had a reduction in volume and cost of 10.34% from the MC-0 budget plan. Meanwhile, to calculate the cost of the panel plate, there are 2 ways, namely using the AHSP panel plate & using the price from the service provider. For the cost of using AHSP Kediri city is Rp. 241,018,994.48, while using the cost from the service provider is Rp. 170,400,000.00. To compare the cost of conventional plate work with panel plates, it is calculated based on the most efficient cost in calculating the cost of the work. For the cost of panel plates of Rp. 170,400,000.00. with the real cost of conventional floor plate work (MC-100) of Rp. 199,113,443.36, which means it has a comparison of 14.42%, therefore the panel floor plate work is 14.42% cheaper than conventional floor plates.

Diterbitkan

2025-06-30